High Speed 2 Phase Two : ウィキペディア英語版 | High Speed 2 Phase Two (詳細はBirmingham, Manchester and Leeds. The railway is to be delivered in two phases. The first phase linking London and Birmingham, the second linking Birmingham with Manchester and Leeds. Phase Two is planned for completion in 2032–33. The concept was that all major cities in the area covered by HS2 would have a city centre station. Liverpool along with London, Birmingham, Manchester and Leeds was envisaged to have a city centre HS2 station. The preliminary route for Phase Two was announced on 28 January 2013. It is envisaged construction on Phase Two will start in 2022 with completion by 2032. ==Background==